PRE.BUILT Govt Hospital at Sunni

PRE.BUILT Govt. Hospital at Sunni
Location: Sunni, Himachal Pradesh
No. of Beds - 30
Client - Govt. of Himachal
Construction - Synergy Thrislington

The PRE.BUILT Hospital at Sunni has been designed employing Prefabricated construction which is a building process in which modules of a building are assembled at a remote location, then transported to the building site. This particular construction method is very cost-effective and often makes it possible to complete a building project in as much as half the time required for more traditional methods.
The hospital has a construction time frame of 5 months.
Construction has begun in May 2014.




Comments

  1. hy . i am an architecture student . i am doing my architecture thesis on hospital . i would love to know more about the planning and design process of this hospital .

    ReplyDelete

Post a Comment